The engineers and technicians designed, built and integrated line for a Chinese OEM's mechatronics sector.
For this OEM's mechatronics sector, design, production, integration and commissioning of a 37-meter long line to assemble the alternator-starter module of the "stop & start" system.
- Component bin-picking by robot, with localization by industrial vision.
- Crimping by electric press
- Heading
- Removal of sealing and thermal glue pattern removal
- Hot polymerization
- Removal of two-component gel under vacuum
- Parametric and dielectric tests
- Assembly inspection
- Traceability and pairing of subsets.