Adisseo

Saint Clair du Rhône et Péage de Roussillon (38)

Adisseo entrusted Clemessy with a 5-year maintenance contract as part of shutdown work.

Performance-oriented maintenance contract in the fields of industrial analysis, instrumentation and electricity at two SEVESO 2 "high threshold" chemical production sites
This contract is part of the biennial technical shutdown works.
 

  • 5-year contract.
  • Major mobilization of staff on site over a period of one month (around 65 technicians during the last technical shutdowns in April 2017).