The CNR (Compagnie Nationale du Rhône) entrusted the Clemessy teams with the design and construction of a ground-based photovoltaic power station.
Design and construction of a 5MWp ground-mounted photovoltaic power plant
- Solar cable laying: 36 km
- LV cable pulling: 5 km
- HV cable pulling: 0,5 KM
- Connection of 15616 modules
- Installation and connection of 22 inverters (Huawei 185 KLT)
- Installation and connection of a 1 x 3000 KVA substation
- Installation and connection of a 1 x 1,100 KVA mixed delivery station