EDF

La Coche (73)

The Clemessy teams designed and completed the monitoring & control systems of the hydroelectric power plant.

Design and completion of the monitoring & control and electrical auxiliaries of the fifth generator unit of the La Coche hydroelectric power plant.

For the monitoring & control systems and the electrical auxiliaries of the G5 unit:

  • Engineering,
  • Supply,
  • Installation,
  • Connection,
  • Commissioning of the equipment relating to the monitoring & control and associated electrical auxiliaries.