Clemessy is committed to nuclear research and supports the ITER project.
Engineering and installation of the electrical equipment for the TB04 on the ITER project.
The TB04 is a set of 9 buildings including the assembly hall and fuel preparation before entering the Tokamak, and the buildings housing the cryoplant for cooling the containment chamber.
Work at heights: 60 m.
Seismic supports with calculations and associated definitions.