Syctom

Saint-Ouen (93)

The teams carried out work to bring the incinerator into compliance.

Compliance with atmospheric emissions from the incinerator.
Carrying out the MV/LV electricity and monitoring & control work package as part of the switch to dry treatment of the emissions from the 3 household waste incineration lines. 

  • Safety loop calculations
  • Implementation of water-cooled regenerative frequency inverters
  • IS333 withdrawable switchboards
  • Works at a plant while in operation, with the constraints of short shutdowns.