The teams carried out work to bring the incinerator into compliance.
Compliance with atmospheric emissions from the incinerator.
Carrying out the MV/LV electricity and monitoring & control work package as part of the switch to dry treatment of the emissions from the 3 household waste incineration lines.
- Safety loop calculations
- Implementation of water-cooled regenerative frequency inverters
- IS333 withdrawable switchboards
- Works at a plant while in operation, with the constraints of short shutdowns.