The work, which takes two weeks per depot, was carried out in 2025. “We also presented our BEMS demonstrator to the client – software that optimises photovoltaic energy production, storage and battery charging based on multiple parameters,” explains Fabien Herbreteau, Technical Sales Manager. “This is a key issue for the future, as energy management is becoming a major priority.”
to discover also
-
17.07.2026Eiffage Énergie Systèmes mobilises its Hydraulics Technical...In Le Havre harbour (76), Eiffage Génie Civil Réseaux is leading the replacement of the siphon in the Îlet outfall, a strategic structure bored beneath the Vétillart... -
10.07.2026An Innovative Project for RTE in MarcoussisThis project demonstrates Eiffage Énergie Systèmes’ ability to pool resources and manage complex electrical infrastructure projects. -
02.07.2026Eiffage Énergie Systèmes takes part in the phased roll-out...Eiffage Énergie Systèmes has been working with Yusco, a subsidiary of the AFM-owned Voltalia Group, since 2025 to install charging points in the Auchan, Decathlon...